-
Alstom- Shanghai -China
Challenges: Short Lead Time, 3-D curved Panel at Corner¥ 0.00LEARN MORE
-
Business Park- Doha-Qatar
Challenges: Not one building has regular shape, irregular egg-shape conference building, lot decoration features.¥ 0.00LEARN MORE
-
Dow Chemical-Shanghai- China
Challenges: football shape feature walls, achieved by custom shape GFRC panel combined with bent glass..¥ 0.00LEARN MORE
-
Eteck HQ-Trinidad
Eteck HQ-Trinidad¥ 0.00LEARN MORE
-
Haier-Qingdao-China
Challenges: 20m diameter, all Aluminum framed. Many different color glass.¥ 0.00LEARN MORE
-
Irkusk office building- Russia
Irkusk office building- Russia¥ 0.00LEARN MORE
-
NCB Tower-Jamaica
NCB Tower-Jamaica¥ 0.00LEARN MORE
-
Reformer 10- Guatemala
Reformer 10- Guatemala¥ 0.00LEARN MORE
-
Rohm Haas- Shanghai- China
Challenges: All glass walls are unitized, it has lot in and out, at couple locations, curtainwall are recessed. On one elevation, it has big full facade sunshade, fabrication and installation had to be very precise.¥ 0.00LEARN MORE
-
Silhouette Rower-Doha-Qatar
Challenges: 2-months lead time for shop drawings, all curtainwall needs to be finished installation within 1 year. Irregular shape at tops..¥ 0.00LEARN MORE
-
Skycity Marriot-Hongkong
Challenges: unitized window wall, STC rating is 45, and passed 35psf water test for both fixed and operable window.¥ 0.00LEARN MORE